Building the Kitchen
(Updated 09/07/08)
Refrigirator / Pantry / Coffee Center |
|
All Upper Cabinets |
|
All Base Cabinets and Counter Avonite Counter Top (without doors) 12/31/07 |
|
All the Cabinet Doors and Drawer Fronts are installed, except the one I forgot to make (OPPS). 05/31/08 |
|
Last Drawer Front and Crown Molding 09/07/08 |
|
Everything is done and complete 09/07/08 |